H.R. 6633 · 119th Congress

High-Capacity Grid Act

Introduced Dec 11, 2025Policy area: Energy

Constitutional authority the sponsor cites: Article I, Section 8, Clause 3

SponsorJulie Fedorchak + 4 cosponsors
Julie Fedorchak R-ND-AL

Cosponsors (4)

CommitteesEnergy and Commerce Committee + 2 more
Subjects6 subjects
  • Advisory bodies
  • Electric power generation and transmission
  • Energy efficiency and conservation
  • Energy prices
  • Energy storage, supplies, demand
  • Technology assessment

Status: Passed House

  1. Introduced (done)
  2. Committee (done)
  3. Passed House (current)
  4. Passed Senate
  5. To President
  6. Law

Latest action

: Received in the Senate and Read twice and referred to the Committee on Energy and Natural Resources.

Summary

High-Capacity Grid Act

This bill requires public electric utilities to use the best-available transmission conductor for certain interstate transmission lines (i.e., power lines) in order to recover the costs of the conductor through consumers' electric bills.

Specifically, in any filing seeking to recover the costs of a transmission conductor for the transmission line and in any proceeding to determine if the costs may be recovered through rates, the bill directs the Federal Energy Regulatory Commission to presume that (1) the use of a best-available transmission conductor is a prudent practice and that the associated costs are just and reasonable, and (2) the use of a transmission conductor that is not a best-available transmission conductor is not prudent and that the associated costs are not just and reasonable.

Read the full summary (203 words)

A best-available transmission conductor is a conductor that (1) provides the greatest feasible and commercially available energy-carrying capacity at a given voltage level, (2) provides the highest feasible and commercially available electrical efficiency at that voltage level, and (3) mitigates thermal sag (drooping of power lines) at the maximum rated transmission-carrying capacity of the facility.

The bill applies to projects to (1) construct new transmission facilities; or (2) modify, upgrade, or replace an existing transmission line.

Summary by the Congressional Research Service.

Actions

  1. Senate

    Received in the Senate and Read twice and referred to the Committee on Energy and Natural Resources.

  2. House

    Motion to reconsider laid on the table Agreed to without objection.

  3. House

    On motion to suspend the rules and pass the bill, as amended Agreed to by voice vote. (text: CR H5662)

  4. Passed/agreed to in House: On motion to suspend the rules and pass the bill, as amended Agreed to by voice vote.

  5. House

    DEBATE - The House proceeded with forty minutes of debate on H.R. 6633.

  6. House

    Considered under suspension of the rules. (consideration: CR H5662-5663)

  7. House

    Mr. Guthrie moved to suspend the rules and pass the bill, as amended.

  8. House

    Placed on the Union Calendar, Calendar No. 723.

  9. House

    Reported (Amended) by the Committee on Energy and Commerce. H. Rept. 119-824.

  10. House

    Ordered to be Reported (Amended) by the Yeas and Nays: 49 - 0.

  11. House

    Committee Consideration and Mark-up Session Held

  12. House

    Committee Consideration and Mark-up Session Held

Show 5 earlier actions
  1. House

    Forwarded by Subcommittee to Full Committee (Amended) by Voice Vote.

  2. House

    Subcommittee Consideration and Mark-up Session Held

  3. House

    Referred to the House Committee on Energy and Commerce.

  4. House

    Referred to the Subcommittee on Energy.

  5. Introduced in House